Audi 100

1982-1990 of release

Repair and operation of the car




Audi 100
+ 1.1. Governing bodies and devices
+ 2. Technical characteristics
+ 3. Engines
+ 4. Cooling system
+ 5. Exhaust system
+ 6. Power supply system
- 7. Transmission
   + 7.1. Coupling
   + 7.2. Mechanical drive of switching off of coupling
   + 7.3. Hydraulic drive
   - 7.4. Transmission
      + 7.4.1. Four-speed transmission of type 014
      + 7.4.2. Five-speed transmission of type 013 or 093
      + 7.4.3. Five-speed transmission of types 016 and 012
      + 7.4.4. Mechanism of management of gear shifting of KP of 016 type
      - 7.4.5. Automatic transmission
         7.4.5.1. Removal and installation of a transmission
         7.4.5.2. Mechanism of management of switching of a transmission
         7.4.5.3. Electromagnetic switch of blocking of the lever of the selector
   + 7.5. Drive of forward wheels
+ 8. Running gear
+ 9. Steering
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


7.4.5.1. Removal and installation of a transmission

GENERAL INFORMATION

Automatic transmission of type 087


1 – returnable spring;
2 – arm;
3 – plug;
4 – bolt;
5 – arm;
6 – draft;
7 – rope;
8 – arm;
9 – draft lever;
10 – draft;
11 – tip;
12 – lever of a butterfly valve;
13 – carburetor;
14 – accelerator pedal;
15 – limiter;
16 – lever

Automatic transmission of type 089

1 – arm;
2 – contact block;
3 – nut;
4 – bolt;
5 – plug;
6 – bolt;
7 – plug;
8 – holder of the boss of a lamp of illumination;
9 – screw;
10 – contact bridge;
11 – selector lever;
12 – spring;
13 – rod;
14 – console arm;
15 – screw;
16 – protective cover;
17 – selector lever handle;
18 – screw;
19 – console

Removal

PERFORMANCE ORDER
1. To disconnect a wire from the "minus" plug of the battery.
2. To disconnect two hoses from the oil heater and to muffle their openings.
3. To disconnect a speedometer drive cable from a transmission.
4. To hang out the engine.
5. To remove a starter (see subsection 12.1.4.1).
6. To turn off serially bolts of fastening of the hydrotransformer to a flywheel through openings for a starter, scrolling a cranked shaft.
7. To turn off bolts of fastening of internal CV JOINTS of half shafts.
8. To remove a reception pipe of mufflers with an arm.
9. To disconnect a returnable spring 1.
10. To disconnect draft of the 6th management of a butterfly valve from a transmission.
11. To disconnect a gear shifting cable from the transmission lever.
12. To pick up the masloslivny phone, having substituted previously under a transmission capacity for the merged oil.
13. To turn off nuts of fastening of a transmission to a forward suspension bracket
14. To raise a few transmission.
15. To turn off the lower bolts of fastening of a transmission to the engine.
16. To remove a transmission, watching that the hydrotransformer did not drop out of a coupling case.
17. To fix the hydrotransformer in a coupling case.

Installation

PERFORMANCE ORDER
1. To establish a transmission, watching that the hydrotransformer remained on the seats in a coupling case. Correctness of installation of the hydrotransformer in a case of coupling is defined by the size a which about 30 mm have to be.
2. To wrap the lower bolts of fastening of a transmission to the engine.
3. To establish support of fastening of a transmission to a beam of a forward suspension bracket.
4. To establish an oil-filling tube of a transmission.
5. To connect a gear shifting cable to the transmission lever.
6. To establish draft of management of a butterfly valve.
7. To establish a returnable spring.
8. To establish a reception pipe of mufflers with an arm.
9. To connect drives of forward wheels.
10. To wrap serially bolts of fastening of the hydrotransformer to a flywheel through openings for a starter, scrolling a cranked shaft.
11. To establish a starter.
12. To connect a speedometer drive cable.
13. To connect hoses to the oil heater.
14. To add cooling liquid to the demanded level.
15. To fill in oil in a transmission.