Audi 100

1982-1990 of release

Repair and operation of the car




Audi 100
+ 1.1. Governing bodies and devices
+ 2. Technical characteristics
+ 3. Engines
+ 4. Cooling system
+ 5. Exhaust system
- 6. Power supply system
   + 6.1. Power supply system of carburetor engines
   - 6.2. A power supply system of engines with fuel injection
      6.2.1. Replacement of the filtering element of the air filter
      6.2.2. Removal and installation of the air filter
      6.2.3. Replacement of the fuel filter
      6.2.4. Removal and installation of the distributor of fuel
      6.2.5. Dismantling and assembly of the reducing valve
      6.2.6. Removal and installation of the fuel accumulator
      6.2.7. Removal and installation of fuel nozzles
      6.2.8. Removal and installation of a turbocompressor
      6.2.9. Removal and installation of a fuel tank
      6.2.10. Removal and installation of the fuel pump
      6.2.11. Check of a temperature regulator
      6.2.12. Adjustment of idling of the engine
      6.2.13. Check of a starting nozzle
      6.2.14. Check of the regulator of pressure
      6.2.15. Check and adjustment of provision of a plate of the measuring instrument of a consumption of air
   + 6.3. Power supply system of the diesel engine
+ 7. Transmission
+ 8. Running gear
+ 9. Steering
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


6.2.8. Removal and installation of a turbocompressor

GENERAL INFORMATION

Turbo-supercharging elements

1 – intermediate cooler of air;
2 – screw collar;
3 – an air supply hose from the compressor
to a cooler;
4 – drain oil pipeline;
5 – pipe of supply of cooling liquid
to the compressor;
6 – pipe plum of cooling liquid;
7 – turbocompressor;
8 – laying;
9 – a branch pipe of supply of oil to a turbocompressor;
10 – reception pipe of the muffler;
11 – final collector;
12 – intermediate pipe;
13 – regulator of shutdown of the compressor;
14 – thermoswitch;
15 – sensor of turning on of the fan of cooling;
16 – idling stabilizer valve;
17 – branch pipe of a shirt of cooling of the engine;
18 – a hose from a cooler to a head of the block of cylinders;
19 – an air supply hose to an inlet pipe of the engine

PERFORMANCE ORDER
1. To disconnect a wire from the "minus" plug of the battery.
2. To weaken an inhaling of collars and to remove an air supply hose to an inlet pipe of the engine.
3. To weaken an inhaling of collars and to remove an air duct (see rice. Basic elements of system of injection of fuel).
4. To uncover the air filter with the filtering element (see subitem 1-2 of subsection 6.2).
5. To turn off bolts of fastening and to remove a heat-insulating guard on the right arm of an engine mount.
6. To turn off nuts of fastening of a reception pipe of the muffler (see rice. Turbo-supercharging elements) to a turbocompressor.
7. To turn off nuts of fastening and to disconnect an intermediate pipe from the regulator of shutdown of the compressor.
8. To disconnect a reception pipe from an arm on a transmission and to remove it with laying.
9. To weaken an inhaling of collars and to remove the hose bringing air to the generator.
10. To turn off nuts of fastening and to remove a drain oil pipeline.
11. On models with the turbocompressor cooled by liquid to disconnect a pipe of supply of cooling liquid to the compressor and a pipe liquid plum.
12. To remove the generator with an arm (see subsection 12.1.3.1).
13. To turn off nuts of fastening and to remove a turbocompressor from a final collector.
14. To establish a turbocompressor upside-down.