Audi 100

1982-1990 of release

Repair and operation of the car




Audi 100
+ 1.1. Governing bodies and devices
+ 2. Technical characteristics
- 3. Engines
   - 3.1. Four-cylinder engines
      3.1.1. Removal and installation of the engine
      - 3.1.2. Dismantling and assembly of the engine
         3.1.2.1. Removal and installation of a head of the block of cylinders
         3.1.2.2. Removal of a camshaft and pushers of valves
         3.1.2.3. Survey of a camshaft
         3.1.2.4. Definition of technical condition of hydropushers of valves
         3.1.2.5. Installation of a camshaft and pushers of valves
         3.1.2.6. Removal and installation of valves (dismantling of a head of the block)
         3.1.2.7. Survey, troubleshooting and repair of details of a head of the block of cylinders
         3.1.2.8. Gaps between cams of a cam-shaft and pushers of valves
         3.1.2.9. Camshaft drive
         3.1.2.10. Removal and installation of an intermediate shaft
         3.1.2.11. Removal and installation of a flywheel
         3.1.2.12. Replacement of epiploons of a cranked shaft
         3.1.2.13. Removal and installation of an oil case
         3.1.2.14. Removal, check and installation of the oil pump
         3.1.2.15. Dismantling of shatunno-piston group
         3.1.2.16. Survey and check of details of shatunno-piston group
         3.1.2.17. Assembly of shatunno-piston group
         3.1.2.18. Removal, survey and installation of a cranked shaft
   + 3.2. Five-cylinder engines
   + 3.3. Diesel engine
+ 4. Cooling system
+ 5. Exhaust system
+ 6. Power supply system
+ 7. Transmission
+ 8. Running gear
+ 9. Steering
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


3.1.2.18. Removal, survey and installation of a cranked shaft

PERFORMANCE ORDER
1. To remove shatunno-piston group (see subsection 3.1.2.15).
2. To uncover epiploons of a cranked shaft with epiploons (see the item 2 of subsection 3.1.2.12) (a forward epiploon), subitem 1-2 of subsection 3.1.2.12) (a back epiploon).
3. To check marking on covers of radical bearings. If she is not visible, to mark covers number of the bearing.
4. To turn off bolts of 9 covers of radical bearings and to uncover 10 with inserts 8 (see rice. Cranked shaft and block of cylinders).
5. To remove a cranked shaft and to take out inserts 13 of beds of radical bearings and persistent half rings 1, previously having marked them number of the bearing.
6. To examine a cranked shaft. On working surfaces should not be having chopped off, zaboin, scratches, etc. Small scratches can be polished and then to zapolirovat. To measure diameters of a neck of shatunny and radical bearings. If they it is less nominal (the radical bearing of 57,96-57,98 mm, shatunny 45,96–45,98 mm), to pereshlifovat them under the repair size.
7. To establish inserts of 13 radical bearings in a bed so that the ledge of an insert entered dredging of a bed, and the opening for supply of oil in an insert coincided with an opening in a bed. If inserts of the bearing No. 3 have no flanges, to establish persistent half rings 1. To oil engine inserts and half rings.
8. To lay a cranked shaft on beds of radical bearings, previously having oiled necks of a cranked shaft the engine.
9. To establish in covers of 10 bearings inserts 8 and persistent half rings 1 and to oil the engine.
10. To establish covers into place according to earlier made marking, to insert bolts 9 into a cover of the central bearing, to wrap and tighten the moment of 65 N · m (6,5 kgfs · м). To check that the cranked shaft freely rotated.
11. To establish and tighten covers of other bearings, going in the direction from the central bearing. After installation of the next cover to be convinced that the cranked shaft rotates freely.
12. To check an axial gap of a cranked shaft for what to insert the probe between a cheek of a cranked shaft and a persistent ring of the average bearing, displacing a shaft in the axial direction in one, and then in other party.
13. In an end face of a cranked shaft from a flywheel the bearing 14 of primary shaft of a transmission (see rice is inserted. Cranked shaft and details of shatunno-piston group). It is possible to take out the bearing a wire hook. To press the new bearing inscriptions outside, having drowned it on 1,5 mm from an end face of a cranked shaft.
14. To establish new epiploons of a cranked shaft.
15. To establish shatunno-piston group.